SI.No. | QoS Parameters | Benchmarks | Averaged over a period of |
1 | Service Provisioning /Activation Timebr> | 100% cases in =<15 working days (subject to technical feasibility). In all cases where payment towards installation charge & security deposit is taken and the Broadband connection is not provided within 15 working days, a credit at the rate of Rs.10/ per day, subject to a maximum of installation charge or equivalent usage allowance shall be given to the customer, at the time of issue of first bill. | |
2 | Fault Repair / Restoration Time | By next working day: > 90% and within 3 working days: 99%
Rebate: (a) Faults Pending for > 3 working days and < 7 working days: rebate equivalent to 7 days of minimum monthly charge or equivalent usage allowance (b) Faults Pending for > 7 working days and < 15 working days: rebate equivalent to 15 days of minimum monthly charge or equivalent usage allowance (c) Faults Pending for > 15 working days: rebate equivalent to one month of minimum monthly charge or equivalent usage allowance | One month |
3 | Billing Performance:
Billing complaints per 100 bills issued
%age of Billing Complaints resolved
Time taken for refund of deposits after closure:
| <2%
100% within 4 weeks
100% within 60 days
| One month |
4 | Response time to the customer for assistance | Percentage of calls answered by operator (Voice to Voice)
Within 60 seconds > 60%
Within 90 seconds > 80%
| One month |
5 | Bandwidth Utilization/ Throughput:
a) Bandwidth Utilization i) POP to ISP Gateway Node [Intra-network] Link(s) ii) ISP Gateway Node to IGSP / NIXI Node upstream Link(s) for International connectivity b) Broadband Connection Speed (download) | <80% link(s)/route bandwidth utilization during peak hours (TCBH). If on any link(s)/route bandwidth utilization exceeds 90%, then network is considered to have congestion. For this additional provisioning of Bandwidth on immediate basis, but not later than one month, is mandated.
Subscribed Broadband Connection Speed to be met >80% from ISP Node to User.
| One month |
6 | Service Availability / Uptime (for all users) | > 90% quarter ending June 2007;
> 98% with effect from quarter ending September 2007 and onwards
| One Quarter |
7 | Packet Loss (for wired broadband access) | < 1% | One month |
8 | Network Latency (for wired broadband access)
User reference point at POP / ISP Gateway Node to International Gateway (IGSP/NIXI)
User reference point at ISP Gateway Node to International nearest NAP port abroad (Terrestrial)
User reference point at ISP Gateway Node to International nearest NAP port abroad (Satellite)
| <120 msec
<350 msec
<800 msec
| One month |